STACK CHI01 Campus
STACK CHI01 Campus is a documented Operational AI data center by STACK Infrastructure in Cook, Illinois, United States. 40 MW announced IT load. Power and grid context on the AIxEnergy map.
- Operator
- STACK Infrastructure
- Location
- Cook, Illinois, United States
- Status
- Operational
- Announced IT load
- 40 MW
The mapped point is an approximate location for screening, not a verified parcel.
Open this project on the interactive map
Part of AIxEnergy. Also see AIxEnergy Capital and AIxEnergy Large Load Monitor.