Beacon Point Texas Campus
Beacon Point Texas Campus is a documented Construction-ready AI data center by Hut 8 in Nueces County / Robstown, Texas, United States. 1,000 MW announced IT load. Power and grid context on the AIxEnergy map.
- Operator
- Hut 8
- Location
- Nueces County / Robstown, Texas, United States
- Status
- Construction-ready
- Announced IT load
- 1,000 MW
The mapped point is an approximate location for screening, not a verified parcel.
Open this project on the interactive map
Part of AIxEnergy. Also see AIxEnergy Capital and AIxEnergy Large Load Monitor.