Ascenty Vinhedo 3

Ascenty Vinhedo 3 is a documented Under construction AI data center by Ascenty in Vinhedo, Brazil. 90 MW announced IT load. Power and grid context on the AIxEnergy map.

Operator
Ascenty
Location
Vinhedo, Brazil
Status
Under construction
Announced IT load
90 MW

The mapped point is an approximate location for screening, not a verified parcel.

Open this project on the interactive map

Part of AIxEnergy. Also see AIxEnergy Capital and AIxEnergy Large Load Monitor.