Ascenty Vinhedo 2
Ascenty Vinhedo 2 is a documented Operational AI data center by Ascenty in Vinhedo, Brazil. 34 MW announced IT load. Power and grid context on the AIxEnergy map.
- Operator
- Ascenty
- Location
- Vinhedo, Brazil
- Status
- Operational
- Announced IT load
- 34 MW
The mapped point is an approximate location for screening, not a verified parcel.
Open this project on the interactive map
Part of AIxEnergy. Also see AIxEnergy Capital and AIxEnergy Large Load Monitor.