Johor data center map
Johor data center map in Malaysia: 6 documented AI and hyperscale projects. 450 MW of announced IT load across 2 projects that disclosed a figure. Load is undisclosed for the other 4. Operators with projects here include OPEN DC SDN BHD, AirTrunk, Equinix, Inc., Vantage Data Centers, YTL Power International. Mapped points are approximate screening locations, not verified parcels.
- Johor JHB1 Campus — Energizing · 300 MW announced · Sedenak Tech Park, Johor, Malaysia
- AirTrunk JHB1 — Operational · 150 MW announced · Johor Bahru, Johor, Malaysia
- Equinix JH1 - Johor — Operational · load undisclosed · Iskandar Puteri, Johor, Malaysia
- Open DC JB1 - Menara MSC Cyberport — Operational · load undisclosed · Johor Bahru, Johor, Malaysia
- Open DC JB2 - Menara Ansar — Operational · load undisclosed · Johor Bahru, Johor, Malaysia
- YTL Power Sedenak Tech Park West (STeP West) Campus — Announced / early planning · load undisclosed · Sedenak Tech Park West (STeP West), Johor, Malaysia
Part of AIxEnergy. Also see AIxEnergy Capital and AIxEnergy Large Load Monitor.