Chiba data center map
Chiba data center map in Japan: 6 documented AI and hyperscale projects. 309 MW of announced IT load across 4 projects that disclosed a figure. Load is undisclosed for the other 2. Operators with projects here include MC Digital Realty, NTT Global Data Centers, AirTrunk, AIST. Mapped points are approximate screening locations, not verified parcels.
- NTT Tokyo TKY12 Inzai-Shiroi Campus — Under construction · 200 MW announced · Inzai-Shiroi / Greater Tokyo, Chiba, Japan
- NTT Tokyo TKY11 Shiroi Campus — Under construction · 50 MW announced · Shiroi / Greater Tokyo, Chiba, Japan
- Digital Realty / MC Digital Realty Tokyo NRT12 — Operational · 34 MW announced · Inzai / Greater Tokyo, Chiba, Japan
- Digital Realty / MC Digital Realty Tokyo NRT14 — Operational · 25 MW announced · Inzai / Greater Tokyo, Chiba, Japan
- ABCI 3.0 — Operational · load undisclosed · Kashiwa, Chiba, Japan
- AirTrunk TOK2 — Operational · load undisclosed · Inzai, Chiba, Japan
Part of AIxEnergy. Also see AIxEnergy Capital and AIxEnergy Large Load Monitor.